Solar park projects
MKG GÖBEL has realised more than 750 PV installations – in Europe and around the world. We selected for you some of the most interesting projects.
Featured projects
Heuchlingen (D)
ca. 115 kWp
Agri PV
System: GMS® DOUBLE
July 2022
Bavelse Berg (NL)
ca. 37 MWp / 94,000 modules
Landfill site, Bifacial modules
System: GMS® MAX II-6H with ASSEMBLY 2.0
Lelystad II (NL)
ca. 12.7 MWp / 31,836 modules
System: GMS® MAX II-6H-EW
Büren (D)
ca. 1.5 MWp / 4,686 modules
Agri PV
System: GMS® DOUBLE
March 2020
Corn Island (NI)
2.2 MWp / 6,372 modules
System: GMS® MAX II-6H
Eemshaven (NL)
5.4 MWp / 16,950 modules
System: GMS® MAX
Veendam (NL)
15.5 MWp / 57,288 modules
System: GMS® MAX II-6H
Solar parks 2024
Soest-Hattrop (D)
ca. 8.41 MWp / 19,344 modules
System: GMS® MAX II-6H
March – May 2024
Hoschenhof (D)
ca. 6,634 kWp / 10,614 modules
System: GMS® MAX II-3V with ASSEMBLY 2.0
January – March 2024
Malloa (CL)
ca. 3 MWp / 7,062 modules
System: GMS® MAX II-6H with ASSEMBLY 2.0
January – March 2024
Heuchlingen II (D)
ca. 225 kWp / 1,064 modules
Agri PV, bifacial modules
System: GMS® DOUBLE
December 2023 – February 2024
Solar parks 2023
Kirchberg (D)
ca. 77 kWp / 192 modules
System: GMS® DOUBLE
November – December 2023
Illertissen (D)
ca. 3.9 MWp / 6,942 modules
System: GMS® MAX
November – December 2023
Altlußheim (D)
ca. 1.4 MWp / 3,564 modules
System: GMS® MAX
June 2023
Hasborn (D)
ca. 12.6 MWp / 23,328 modules
System: GMS® MAX
February – March 2023
Weidingen (D)
ca. 19.8 MWp / 37,152 modules
System: GMS® MAX
January – February 2023
Solar parks 2022
Lindenhof (D)
ca. 9.5 MWp / 17,430 modules
System: GMS® MAX
August – September 2022
Affler II (D)
ca. 4.4 MWp / 8,262 modules
Slope installation
System: GMS® MAX
August 2022
Vohenstrauß II (D)
ca. 1.4 MWp / 3,411 modules
System: GMS® MAX
July 2022
Heuchlingen (D)
ca. 115 kWp
Agri PV
System: GMS® DOUBLE
July 2022
Großrinderfeld I (D)
ca. 3.9 MWp / 8,676 modules
System: GMS® MAX
May 2022
Brunnen (D)
ca. 124 kWp / 366 modules
Agri PV
System: GMS® DOUBLE
April – May 2022
Bruhrain III (D)
ca. 6.2 MWp / 13,702 modules
System: GMS® MAX
April 2022
Zweibrücken (D)
ca. 750 kWp / 1,980 modules
System: GMS® DOUBLE
December 2021 – February 2022
Wiedersbach (D)
ca. 4.4 MWp / 11,742 modules
System: GMS® FLEX
January 2022
Ballmannshof (D)
ca. 5.5 MWp / 11,952 modules
System: GMS® MAX
January 2022
Solar parks 2021
Vienna (A)
ca. 120 kWp / 290 modules
System: GMS® DOUBLE
October 2021
Beidweiler II (LU)
ca. 2.8 MWp / 6,417 modules
System: GMS® MAX
September – October 2021
Buchschwabach V (D)
ca. 3.55 MWp / 7,244 modules
System: GMS® MAX
September – October 2021
Schornhof (D)
ca. 110 MWp / 310,860 modules
System: GMS® MAX II-6H
April – September 2021
Widdern-Seehaus (D)
ca. 9 MWp / 20,547 modules
System: GMS® MAX
July – August 2021
Stralendorf (D)
ca. 750 kWp / 1,972 modules
Landfill site
System: GMS® MAX
Lauperath (D)
ca. 8 MWp / 21,621 modules
Slope installation
System: GMS® FLEX
March – May 2021
Bavelse Berg (NL)
ca. 37 MWp / 94,000 modules
Landfill site, bifacial modules
System: GMS® MAX II-6H with ASSEMBLY 2.0
November 2020 – April 2021
Neidenbach (D)
ca. 2 MWp / 4,080 modules
System: GMS® MAX II-6V
March – April 2021
Föhren (D)
ca. 4.7 MWp / 9,690 modules
Bifacial modules
System: GMS® MAX II-3V
February – March 2021
Saarlouis-Roden (D)
2.15 MWp / 4,389 modules
System: GMS® MAX II-6V
February 2021
Dormagen (D)
749 kWp / 1,020 modules
Landfill site
System: GMS® MAX II-4V
January – February 2021
Solar parks 2020
Diemen (NL)
ca. 1.4 MWp / 1,361 modules
System: GMS® FLEX I-EW
August – October 2020
Lelystad II (NL)
ca. 12.7 MWp / 31,836 modules
System: GMS® MAX II-6H-EW
July 2020
Wörnitz (D)
ca. 2.3 MWp / 5,850 modules
System: GMS® MAX II-6H
May – July 2020
Ostrowo (PL)
ca. 1.5 MWp / 4,476 modules
System: GMS® MAX II-6H
June 2020
Rödental-Weißenbrunn vorm Wald (D)
ca. 750 KWp / 2,115 modules
System: GMS® MAX II-6H
May 2020
Ramsberg I/II (D)
ca. 750 KWp / 1 MWp
2,616 / 3,034 modules
System: GMS® MAX II-6H
July 2019, April 2020
Büren (D)
ca. 1.5 MWp / 4,686 modules
Agri PV
System: GMS® DOUBLE
March 2020
Plütscheid II (D)
750 kWp / 3,168 modules
System: GMS® FLEX II-3V
March 2020
Extension of the 2015 project
Aichach (D)
ca. 10 MWp / 33,770 modules
System: GMS® MAX II-6H
January – March 2020
Öhringen-Untermaßholderbach (D)
750 kWp / 2,574 modules
System: GMS® MAX II-6H
January – February 2020
Solar parks 2019
Beidweiler (LU)
ca. 5 MWp / 16,128 modules
Bifacial modules
System: GMS® FLEX-3V
July – December 2019
Brunnen (D)
ca. 10.1 MWp / 32,787 modules
System: GMS® MAX II-6H
October – November 2019
Wemding (D)
ca. 340 kWp / 1,062 halfcut modules
System: GMS® FLEX
September 2019
Lochem (NL)
8.9 MWp / 22,8962 modules
System: GMS® MAX II-6H
August – October 2019
Lelystad (NL)
28 MWp / 75,252 modules
System: GMS® MAX II-6H-EW
April – August 2019
Corn Island (NI)
2.2 MWp / 6,372 modules
System: GMS® MAX II-6H
April – May 2019
Solar parks 2018
Eemshaven (NL)
5.4 MWp / 16,950 modules
System: GMS® MAX
September – November 2018
Zierikzee (NL)
14.4 MWp / 42,660 modules
System: GMS® MAX II-6H-EW
July – September 2018
Andijk (NL)
15.1 MWp / 44,760 modules
System: GMS® MAX II-6H-EW
July – September 2018
Rennertshofen (D)
5.1 MWp / 18,318 modules
System: GMS® MAX
Ryouma (JP)
ca. 11.4 MWp / 43,846 modules
System: GMS® MAX II-4H
Biburg (D)
750 kWp / 2,680 modules
System: GMS® MAX
Solar parks 2017
Veendam (NL)
15.5 MWp / 57,288 modules
System: GMS® MAX II-6H
September – Dezember 2017
Saidabad (IRN)
1.3 MWp / 4,104 modules
System: GMS® FLEX II-2H
November 2017
Rückweiler (D)
2 MWp / 7,408 modules
System: GMS® FLEX
Fence: 890 m 3D mesh mats with climb-over protection and gate system
Erection time: approx. 6 weeks
Puerto Sandino (NI)
ca. 12.5 MWp / 46,350 modules
Location: Nicaragua, Pacific coast
System: GMS® FLEX I-3H
Kaolack (SN)
ca. 20.1 MWp / 77,112 modules
Location: Senegal
System: GMS® FLEX II-3V
Solar parks 2016
Delfzijl (NL)
30 MWp / 116,334 modules
System: GMS® FLEX
August – December 2016
Herzogenrath (D)
3.8 MWp / 14,283 modules
Slope installation
System: GMS® FLEX
Bilzingsleben (D)
1.85 MWp / 7,128 modules
System: GMS® FLEX
249 m cable trenches, 713 m 3D mesh mats with 2 rows of climbing protection, 1 double-wing gate
Marktredwitz (D)
380 kWp / 1,455 modules
System: GMS® FLEX II-5H
280 m mesh mats with barbed wire, swing gate
Marchington (GB)
5 MWp / 19,224 modules
System: GMS® FLEX I-4H
Großenhain II (D)
1.51 MWp / 5,808 modules
System: GMS® FLEX
Posts embedded in consisting ground with concrete
780 m 3D mesh mats, swing gate
Upper Huntingford (GB)
7.68 MWp / 29,544 modules
System: GMS® FLEX I-4H
Hokkaido (JP)
1.5 MWp / 5,748 modules
System: GMS® FLEX
Solar parks 2015
Hamada (JP)
11 MWp
System: GMS® FLEX, rammed
Miyakojima (JP)
2 MWp
System: GMS® FLEX, concrete foundation
Nasukarasuyama (JP)
1.8 MWp
System: GMS® FLEX
Tengore (GB)
3.62 MWp / 13,920 modules
System: GMS® FLEX, rammed, push-in mounting
Plütscheid (D)
9.97 MWp / 38,364 modules
System: GMS® FLEX
Hurcott (GB)
10 MWp / 38,448 modules
System: GMS® FLEX, rammed