Here, a flood reserve terrain was used economically by installing a south-facing PV system. The GMS® DOUBLE mounting system is optimally suited for this elevated construction. Headroom under the modules: 3.2 m, clearance width: 3.5 m.
Project data
- ca. 120 kWp / 290 modules
- System: GMS® DOUBLE
- October 2021