In England’s central countryside, namely in Staffordshire, the MKG-Team built a 5 MWp PV ground-mounted power plant. Although the planning on the flat terrain was easy, the assembly operation was not: the difficult soil characteristics and the added problem of the rain in England made the assembly operations tremendously difficult. However, the power plant was of course handed-over on schedule.
Project data
- 5 MWp / 19,224 modules
- System GMS® FLEX I-4H