Located in the hilly landscape of the Western Eifel region, we successfully completed a project with several technical challenges. The terrain with a north-facing slope of up to 14° and increased snow loads required careful planning and precise execution. Our 3D terrain planning was already used during the planning phase to accurately analyze the site and develop the best system solution for the project. Thanks to our East-West tilt system, the uneven terrain could be adapted efficiently. Due to existing cable routes from wind turbines, an above-ground foundation solution with shaft foundations was required in one specific area of the project.
Despite these challenging conditions, the project was completed in record time. A project that shows how 3D planning, technical expertise, flexible solutions, and efficient execution make even complex requirements possible.
Project data
- 20 MWp / 32,211 modules
- System: GMS® SCALE II-3V / 2V
- Service package 2 (delivery, ramming + mechanical assembly)
- February – May 2026
- Client: Schoenergie GmbH