Two GMS® MAX solar parks in the Netherlands

Solar park Zierikzee, NL

In 2018 MKG Göbel has built two more large solar parks, in Andijk on the coast of the Ijselmeer and in Zierikzee in the southwest of the Netherlands. Both plants are installed in an east-west direction and have an extremely close row spacing – this is where the GMS® MAX mounting system from MKG Göbel can fully show its advantages. In Zierikzee another peculiarity was the chemically aggressive ground, so the posts of the substructure were concreted in with a plastic protective sleeve.

Despite their size, both projects were completed in just 12 weeks each.

Project data Andijk (NL)

  • Power output of the plant: approx. 15.1 MWp
  • 44,760 modules
  • Mounting system: GMS® MAX II-6H-OW
  • Construction time: approx. 12 weeks (July 2018 – Sept 2018)

Project data Zierikzee (NL)

  • Power output of the plant: approx. 14.4 MWp
  • 42,660 modules
  • Mounting system: GMS® MAX II-6H-OW
  • Construction time: approx. 12 weeks (Aug 2018 – Nov 2018)

Delivery and services

  • Test impact pile driving incl. soil survey and soil analysis
  • Project specific statics
  • On-site delivery of the GMS® MAX II-6H-OW mounting system
  • Mounting of subsystem and modules
  • Electrical installation
  • Foundation works, cable trenches, drainage works
  • for Andijk: supply and installation of fencing and gates