This project was built in an exposed location on the southern slope, which made planning and construction difficult. Another challenge was the power lines, which meant we had to use split posts; this ensured maximum safety and full flexibility.
The result shows the possibilities that arise from the combination of teamwork, expertise and flexible technology – as flexible as your ideas.
Project data
- 8 MWp / 13,500 modules
- System: GMS® SCALE II-3V
- Service package 2 (delivery, ramming, mechanical assembly)
- September – December 2025
- Client: Schoenergie GmbH