A challenging project in the northern German lowlands to the east of Berlin: using our brains and creativity, we managed to design the substructure in Görlsdorf to blend in harmoniously with the terrain. Despite the north-facing slope and extremely hilly terrain, we were able to optimally realise all requirements thanks to project-specific engineering and a super-flexible substructure. An impressive solution!
Project data
- ca. 25.6 MWp / 42,336 modules
- System: GMS® MAX II-3V
- July – October 2024
- Client: Schoenergie GmbH