Solar park Bavelse Berg (NL)
Solar park Bavelse Berg, NL
Solar park Bavelse Berg, NL
ASSEMBLY 2.0 in Bavelse Berg (NL)
ASSEMBLY 2.0 in Bavelse Berg (NL)

MKG Göbel is currently participating in another project of our partner Goldbeck Solar: On a former landfill site east of Breda (NL), a large solar park is being built which will supply electricity for approx. 13,000 households after completion in spring 2021. MKG Göbel supplied the GMS® MAX substructure. The highly innovative ASSEMBLY 2.0 system from MKG Göbel ensured a very rapid installation of the solar panels. Here, bifacial modules were used, which also utilise the diffused light on the rear side and thus have a higher efficiency. Our engineers have optimised the GMS® MAX system for the bifacial modules with some simple modifications.

Also the skills of the MKG installation teams were challenged: they set all posts (concrete foundation) without damaging the surface layer above the landfill waste.

Project data

  • Power output: approx. 37 MWp
  • Mounting system: GMS® MAX II-6V
  • approx. 94,000 modules
  • Construction time: November 2020 – April 2021

Delivery and services

  • On-site delivery of GMS® MAX substructure
  • Post setting
  • Installation works